Certificate of Occupancy, a document issued by the Building Official, in adherence to the format specified in NBCDO Memorandum Circular 01, series of 2020, which attests that the building/structure has been finalized and is suitable for occupation/use as per the approved purpose.
Step 1 of 4
APPLICATION FOR CERTIFICATE OF OCCUPANCY (ALL BUILDINGS / STRUCTURES OF MORE THAN TWO STOREY, SPECIAL STRUCTURES UNDERGROUND STRUCTURES AND WINDOWLESS BUILDING)
External Services
Details
|
OFFICE/UNIT |
OFFICE OF THE MUNICIPAL ENGINEER |
|
CLASSIFICATION |
Highly Technical |
|
TYPE OF TRANSACTION |
G2C – Government to Citizens G2B – Government to Business G2G – Government to Government |
|
WHO MAY AVAIL |
The owner/s of newly constructed/renovate/repaired building or structure within the municipality. |
|
|
Construction / erection / addition / alteration / renovation / repair / legalization of the following Highly Technical Type of Project Activity / Structures: i. Residential buildings exceeding 2 storey; ii. Commercial buildings exceeding 2 storey; iii. Market buildings exceeding 2 storey; iv. All applications belonging to Group D of the NBCP; a. Mental hospitals, Sanitaria and Mental Asylums and those belonging to Division D3 of the NBCP; b. Public and Private hospitals (Division D-2 of the NBCP); c. Nursing homes for ambulatory patients, school and home, belonging to Division D-3 of the NBCP; v. Those belonging to Group H and I of the NBCP: a. Recreational or similar public assembly buildings, such as stadia, sports complex, convention centers, etc. b. Structures that have a non-regular form, as classified in the Structural reference Standards; and c. Those buildings/ structures whose use has very advanced structural calculation method in design, as classified in the Structural reference standards. vi. All types of occupancy of more than 2 storeys. vii. All other building/s or structure/s with occupancy and use as for Disaster Response as defined by the National Disaster Risk Reduction and Management Council (NDRRMC). viii. Special Structures such as but not limited to Aerodome Facilities, Fixed Gateway Transit and Passenger Rail Systems, Historical Building and Structures, Historic Centers / Heritage Zones, Wind Turbine Energy Generating Facilities, Immobilized Vehicle and Vessels, Motion Picture and Television Production, Studio Soundstages and approved production facilities, Solar Photovoltaic (PV) System, Towers and underground structures and windowless Buildings. All other transactions not expressly falling under either ‘Complex’ or ‘Highly Technical’ shall, for the purpose of these Guidelines, be considered as ‘Simple’ consistent with the mandate of RA No. 11032. |
Requirements
| # | Checklist & Where to Secure | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
||||||||||||||||||||||
| 2 |
|
||||||||||||||||||||||
| 3 |
|
||||||||||||||||||||||
| 4 |
|
||||||||||||||||||||||
| 5 |
|
||||||||||||||||||||||
| 6 |
|
||||||||||||||||||||||
| 7 |
|
||||||||||||||||||||||
5 STEPS
|
CLIENT STEPS |
AGENCY ACTION |
FEES TO BE PAID |
PROCESSING TIME |
PERSON RESPONSIBLE |
|
1. Submit duly accomplished application forms and supporting documents and claim acknowledgement receipt (stub). |
1.1 Receive and verify the completeness of application documents in accordance with the provided checklist of requirements. (If complete, issue acknowledgement receipt)
1.2 Conducting final inspection, verification and/or review of the building/ structure based on submitted as-built plans and supporting documents and prepare inspection report.
1.3 Evaluation of Building Plans and other supporting documents. Land Use and Zoning, Line and Grade, Architectural, Civil/Structural, Electrical, Mechanical, Sanitary, Plumbing, and Electronics.
1.4 Prepare Order of Payment
1.5 Sign and approve Order of Payment |
None
None
None
Refer to NBC (PD1096) prescribed Schedule of Fees
None |
2 hours
7 days
11 days
4 hours
2 hours |
Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office Engr. Ralph Jayson A. Loto
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
2. Claim Order of Payment |
2. Issue Order of Payment |
None |
10 minutes |
Engr. Ralph Jayson A. Loto |
|
3. Pay Permit fees |
3. Received payment and issue official receipt |
None |
25 minutes |
Cashier Municipal Treasurer’s Office |
|
4. Present O.R. to OBO |
4.1 Check and Record O.R. No, Assign Certificate of Occupancy/Use Number encode on permit forms; stamp plans and permits, and
Segregation of plans and documents for applicant and office copy.
4.2 Sign certificate of Occupancy/Use |
None
None |
4 hours
3 hours |
Engr. Ralph Jayson A. Loto Regino John S. Salamanca Engineering Office
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
5. Claim approved certificate of Occupancy/Use for occupancy |
5. Release Certificate of Occupancy/Use |
None |
25 minutes |
Engr. Marlyn L. Laureta Engr. Ralph Jayson A. Loto Engineering Office |
|
|
TOTAL |
Refer to NBCP (PD1096) prescribed Schedule of Fees |
20 DAYS |
|